PROJECT: Office Re-fit of King William Street, London. SECTOR: Commercial VALUE: Circa £1.8 Million PROGRAMME DURATION: 12 weeks SQUARE FOOTAGE: 1,800 sq. feet ACCIDENT-FREE HOURS: 12,000 PROJECT MANAGER: Luke Willmett DESIGNER: The Engineering Practice OVERVIEW Envirotech Major Projects has recently completed an office fit-out for a renowned insurance broker at King William Street, London; which is a key addition to their impressive
Read MoreSector: Hotel, Leisure and Apartments Work elements: Mechanical, electrical and air conditioning. Period of works: July – October 2012 Total time span: 16 weeks Project value: £949k Overview: Refurbishment of 16th century historic hotel, associated buildings new bedroom block and conference centre, including new electrical, plumbing, heating, ventilation and air conditioning installations. Sympathetically install 38No Mitsubishi
Read MoreSector: Industrial Work elements: Two new 1500kw steam boilers including controls. Two new 600kw chillers. Period of works: January 2014 – May 2014 Total time span: 5 months Project value: £1.688m Overview: To install new steam boilers to provide 250mm steam line for the process plant to produce bio-fuels and supply 15kgs / hour at
Read MoreSector: Industrial Work elements: 4 new biomas boilers 1100kw and 4 new 1100kw gas fired boiler control system Period of works: October 2013 – February 2014 Total time span: 5 months Project value: £2.25m Overview: Design, install test, witness test, commission, demonstrate. Two temporary boilers to maintain ambient heat for the working factory during our
Read MoreSector: Industrial Work elements: New 6.5mw energy centre Period of works: June 2014 – September 2014 Total time span: 12 weeks including 5 week asbestos strip out Project value: £2.2m Overview: 5mw of Heating load Thermal store 34,000 litre BIM model New CHP Revitt Modelling Saving of 489 tonnes of carbon Off site fabrication Temporary
Read MoreSector: Industrial Work elements: Mechanical and electrical Period of works: July 2014 – Sept 2014 Total time span: 11 weeks Project value: £160k Overview: To strip out the old boiler plant, pumps, feed and expansion tanks and install new boilers, pressurisation set, buffer vessels and associated plants including pumps, pipe work, flues, electrical services and