Envirotech Blog

King William Street

10/08/2020

PROJECT: Office Re-fit of King William Street, London.  SECTOR: Commercial VALUE: Circa £1.8 Million PROGRAMME DURATION: 12 weeks SQUARE FOOTAGE: 1,800 sq. feet ACCIDENT-FREE HOURS: 12,000 PROJECT MANAGER: Luke Willmett  DESIGNER: The Engineering Practice   OVERVIEW Envirotech Major Projects has recently completed an office fit-out for a renowned insurance broker at King William Street, London; which is a key addition to their impressive

Read More

Wood Norton Hotel

31/05/2018

Sector: Hotel, Leisure and Apartments Work elements: Mechanical, electrical and air conditioning. Period of works: July – October 2012 Total time span: 16 weeks Project value: £949k Overview: Refurbishment of 16th century historic hotel, associated buildings new bedroom block and conference centre, including new electrical, plumbing, heating, ventilation and air conditioning installations. Sympathetically install 38No Mitsubishi

Read More

Green Energy Immingham Docks

31/05/2018

Sector: Industrial Work elements: Two new 1500kw steam boilers including controls. Two new 600kw chillers. Period of works: January 2014 – May 2014 Total time span: 5 months Project value: £1.688m Overview: To install new steam boilers to provide 250mm steam line for the process plant to produce bio-fuels and supply 15kgs / hour at

Read More

Howdens Joinery

31/05/2018

Sector: Industrial Work elements: 4 new biomas boilers 1100kw and 4 new 1100kw gas fired boiler control system Period of works: October 2013 – February 2014 Total time span: 5 months Project value: £2.25m Overview: Design, install test, witness test, commission, demonstrate. Two temporary boilers to maintain ambient heat for the working factory during our

Read More

Coventry University

31/05/2018

Sector: Industrial Work elements: New 6.5mw energy centre Period of works: June 2014 – September 2014 Total time span: 12 weeks including 5 week asbestos strip out Project value: £2.2m Overview: 5mw of Heating load Thermal store 34,000 litre BIM model New CHP Revitt Modelling Saving of 489 tonnes of carbon Off site fabrication Temporary

Read More

Aston Manor Academy

06/03/2018

Sector: Industrial Work elements: Mechanical and electrical Period of works: July 2014 – Sept 2014 Total time span: 11 weeks Project value: £160k Overview: To strip out the old boiler plant, pumps, feed and expansion tanks and install new boilers, pressurisation set, buffer vessels and associated plants including pumps, pipe work, flues, electrical services and

Read More